This service allows the beneficiaries to apply for GACA validation of Design Change under the provisions of GACAR Part 21 Subpart C “Changes to Type Certificates” when a Major Change Approval or Supplemental Type Certificate (STC) is approved by foreign aviation authorities other than GACA Recognized Foreign NAA (GACAR §21.63(f)). The design change criteria stated in §21.63 also apply to repair designs.
Interim Measures; GACA AC 021-07 Alterations and Repairs and § 21.65 Validation of Design Changes. Once found satisfactory, GACA STCs or other forms of approval specified by the President are issued to signify approval based on design change validation. More details will be provided by the GACA Certification Project Manager (CPM) assigned to this project. Note: the GACA Certification process is based on the FAA Type Certification process.
Only GACA certificated repair stations may perform actual work on Saudi registered aircraft. If the Major Change Approval or STC (issued by GACA Recognized Foreign NAA) is not issued yet, the procedure for Ongoing Certification Project will be used.
المستفدين
Holders of FAA Design Approval (DAH), FAA Organization Designation Authorization (ODA), EASA Design Organization Approval (DOA), or GACA operator or repair station certificate who has engineering resources or can obtain engineering services under contract.
موعد التسليم
10 Business days.
الأسئلة المتداولة
دليل الهيئةالهاتف
1929الإيميل
engineering@gaca.gov.saلاي استفسار او ملاحظات حول الخدمات الحكومية يرجى ملء المعلومات المطلوبة